Sunday, May 6, 2012

Martha's Garden Phase 1




During the winter we've been busy planning Martha's garden. The first step was designing a pavilion for the west side of the house that could use an existing concrete slab. So first we purchased a bunch of lumber... and cut it according to a sketch (and precise engineering drawings, of course). Then the lumber was ready for the paint shop at our Bay area workshop.
It was primed and given a good first coat, loaded on the flatcar and then transported to the Ranch in our truck. There, on a very cold, windy, cloudy Saturday we assembled it.